IBT Bill Wolmuth
IBT Independent Buildin Technology
Areas Of Expertise
Services Offered
Recent Work
Testing Services
Contact
Contact Information
Home

Curtain walling

Example 1:

After the 1960's three storey building was re-clad, it was subject to widespread water penetration with the various parties disputing the causes. Input involved undertaking an independent investigation into the underlying causes; removing a sample panel from the building and lab testing it; progressively introducing remedial measures on the test sample and re-testing each time; establishing the minimum remedial works required to achieve the requisite watertightness; agreeing the required sequence of operations for remedial works; and vetting on site the successful remedial works. The systematic approach to the investigations resulted in the £1m façade being saved at low cost.

 

Example 2:

A five storey office building built using stick system curtain walling.  Severe water ingress occurred from the outset.  IBT brought in by Client when those involved failed to resolve the matter.  Problems identified included defective installation of transome to mullion joints compromising watertightness; defective installation of spandrel panels; and defective installation of pressure plates.  Remedial works regime implemented with rigourous water testing on a bay by bay basis.  No further water leakage reported.

[ Back to Recent Work ]

Example 3:

A multi-storey building on the south coast built using stick system curtain walling about thirty years ago.  Curtain walling reported as problematic from the outset.  IBT brought in by Client to advise on means of improving performance for the benefit of short term tenants.  Advice duly provided.

[ Back to Recent Work ]

Example 4:

A multi-storey building on the south coast built using stick system curtain walling about thirty years ago.  Curtain walling reported as problematic from the outset.  IBT brought in by Client to advise on means of improving performance for the benefit of short term tenants.  Advice duly provided.

[ Back to Recent Work ]

Example 5:

A low rise development of office buildings over twenty years old.  IBT was asked by the Landlord to advise on the condition of the facades in connection with early surrender of the leases by the tenants.  IBT undertook a site inspection and concluded that the installation was generally sound but various maintenance items that were required.

[ Back to Recent Work ]